{"mapSettings":null,"mapData":[{"EntityId":165,"Guid":"a651635c-afda-4e51-ac08-3eabb301477f","ShowOnMap":true,"DisplayInTable":true,"Title":"Atkins Street, Jarrahdale, carpark construction works","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=a651635c-afda-4e51-ac08-3eabb301477f","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Works on construction of new Gooralong carpark, at north end of Atkins Street, Jarrahdale. Works start 10 March and scheduled to finish by end of May. Speed restriction of 40km/h in place, and motorists should be mindful of heavy machinery entering and exiting the work area.","Type":{"EntityId":4,"Name":"Roadworks","MarkerIcon":"/roadreport/controls/images/roadworks-marker.png","WebIcon":"/roadreport/controls/images/roadworks-icon.png","PrimaryColour":"#b04a17","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"7/03/2025","PublishTo":"30/05/2025","LastUpdated":"Monday, 10 March 2025 10:38 AM","SubTitle":""},{"EntityId":166,"Guid":"b5167dd0-e394-4299-aa2d-1310610f4c18","ShowOnMap":true,"DisplayInTable":true,"Title":"City of Rockingham's Mundijong Road Realignment Project","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=b5167dd0-e394-4299-aa2d-1310610f4c18","MapType":"Drawing","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"The City of Rockingham has announced a full road closure for Mundijong Road (between Telephone Lane and Duckpond Road) from Tuesday 8 April to Friday 1 August 2025, as part of its Mundijong Road Realignment Project. Detours include St Albans and Folly Road, Kargotich and Karnup Road, and Thomas Road and King Road. The works include realigning a substandard curve to improve road safety, installing crash barriers on both sides of the road, constructing a raised median with a median crash barrier for added protection, and upgrading street lighting to enhance visibility. For more information, visit the City of Rockingham's website: https://rockingham.wa.gov.au/planning-and-building/current-projects-and-works/mundijong-road-realignment or call them on 9528 0333.","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Wednesday, 2 April 2025 10:09 AM","SubTitle":"Road closure"},{"EntityId":103,"Guid":"b261c4c6-f112-48b1-a418-d565f39cbc95","ShowOnMap":true,"DisplayInTable":true,"Title":"Intersection Pitman Way / George Street - METRONET works","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=b261c4c6-f112-48b1-a418-d565f39cbc95","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Pitman Way is closed and will reopen in mid May. A section of George Street from south of Evans Way to Pitman Way will be closed until mid-May. This is to facilitate construction of a new intersection at Pitman Way and George Street. Access to businesses within the closure is maintained at all times from South Western Highway.","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Tuesday, 22 April 2025 3:34 PM","SubTitle":"New intersection construction"},{"EntityId":142,"Guid":"aedea328-26ce-4b01-ac47-8c9d97e88a14","ShowOnMap":true,"DisplayInTable":true,"Title":"Jarrahdale Road Bridge Replacement","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=aedea328-26ce-4b01-ac47-8c9d97e88a14","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Construction of a new bridge over Gooralong Brook is scheduled to start in early October 2024 and expected to be complete by early July 2025. The bridge will be built using a combination of steel and concrete, ensuring its longevity as part of the local road network and minimising any risk of damage in the event of a fire.\r\n\r\nThe new bridge has also been designed without a central pier, restoring the natural flow of the Gooralong Brook. In keeping with current design standards, the traffic lanes will each be widened by more than one metre and an improved path will be built on the western side. Upgraded street lighting and drainage will complete the project.","Type":{"EntityId":4,"Name":"Roadworks","MarkerIcon":"/roadreport/controls/images/roadworks-marker.png","WebIcon":"/roadreport/controls/images/roadworks-icon.png","PrimaryColour":"#b04a17","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"2/10/2024","PublishTo":"30/04/2025","LastUpdated":"Wednesday, 26 March 2025 11:28 AM","SubTitle":""},{"EntityId":98,"Guid":"f09559a7-e2cf-4ead-861b-948ef560af0d","ShowOnMap":true,"DisplayInTable":true,"Title":"Larsen Road Closure","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=f09559a7-e2cf-4ead-861b-948ef560af0d","MapType":"RoadRoute","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Larsen Road (Between Alexander Road and George Street) will be permanently closed from Monday, 18 December 2023 to accommodate MetCONNX works to install a new rail line and new pedestrian bridge in Byford. The closure is expected to last 18 months.","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Thursday, 4 April 2024 9:55 AM","SubTitle":""},{"EntityId":149,"Guid":"fae361a1-febb-43be-b3a6-2c4e2b4954a2","ShowOnMap":true,"DisplayInTable":true,"Title":"Lightbody/Mundijong Road intersection works","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=fae361a1-febb-43be-b3a6-2c4e2b4954a2","MapType":"Drawing","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Asphalt rectification works will take place on Thursday, 1 May at the intersection where Lightbody Road meets Mundijong Road. Please note that Mundijong Road (between King Road and Kargotich Road) and Lightbody Road (between Mundijong Road and Lowlands Road) will be closed from 7am until 5pm to ensure works are carried out safely. Through traffic and heavy vehicles will be directed to use Thomas Road as the primary alternative route between the Kwinana Freeway and Southwestern Highway. Local traffic will be able to use local roads (e.g., Gossage Road, Orton Road, etc.) between King Road and Kargotich Road.","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"17/04/2025","PublishTo":"5/05/2025","LastUpdated":"Wednesday, 23 April 2025 3:55 PM","SubTitle":"Asphalt rectification works"},{"EntityId":169,"Guid":"7cbb0565-2aaf-4782-9126-ca367ff6e984","ShowOnMap":true,"DisplayInTable":true,"Title":"Mundijong Road seal rectification works","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=7cbb0565-2aaf-4782-9126-ca367ff6e984","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Please be advised road seal rectification works will take place on a 50-metre section of Mundijong Road that's 900 metres west of the Kargotich Road roundabout. These works will be conducted from the 22 - 24 April between 9am and 3pm, subject to any unforeseen circumstances. The section of Mundijong Road will remain open but there will be a lane closure and a stop and slow process in place during these hours.","Type":{"EntityId":3,"Name":"Open With Caution","MarkerIcon":"/roadreport/controls/images/open-caution-marker.png","WebIcon":"/roadreport/controls/images/open-caution-icon.png","PrimaryColour":"#ffbc17","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Wednesday, 16 April 2025 1:18 PM","SubTitle":""},{"EntityId":158,"Guid":"e0ad6957-8947-4bc9-8b24-258f0433adcf","ShowOnMap":true,"DisplayInTable":true,"Title":"Nicholson Road Works","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=e0ad6957-8947-4bc9-8b24-258f0433adcf","MapType":"Drawing","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Please be advised that between Wednesday, 22 January through to the end of April, roadworks will be undertaken at the intersections of Nicholson Road, Blair Road, Foxton Drive and Peters Way, including surrounding approaches. Detours will be in place to manage traffic flow and temporary traffic management will be implemented to ensure safety and minimise delays. Local traffic will be permitted to access and exit their properties.","Type":{"EntityId":3,"Name":"Open With Caution","MarkerIcon":"/roadreport/controls/images/open-caution-marker.png","WebIcon":"/roadreport/controls/images/open-caution-icon.png","PrimaryColour":"#ffbc17","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Tuesday, 15 April 2025 9:15 AM","SubTitle":""},{"EntityId":167,"Guid":"4b0943ca-1c83-4f00-a489-a5c0442c9cba","ShowOnMap":true,"DisplayInTable":true,"Title":"Pure Steel Lane","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=4b0943ca-1c83-4f00-a489-a5c0442c9cba","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"OSMOSE will be conducting wood pole reinforcement works at 11 Pure Steel Lane in Mundijong on 22 April between 7:30am and 5pm. Pure Steel Lane will remain open with a stop/slow in place. Residents will be able to access their properties.","Type":{"EntityId":3,"Name":"Open With Caution","MarkerIcon":"/roadreport/controls/images/open-caution-marker.png","WebIcon":"/roadreport/controls/images/open-caution-icon.png","PrimaryColour":"#ffbc17","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"","PublishTo":"","LastUpdated":"Tuesday, 8 April 2025 2:28 PM","SubTitle":"Pole reinforcement works"},{"EntityId":168,"Guid":"5263e64a-93e0-4490-a5fd-66894f1364a6","ShowOnMap":true,"DisplayInTable":true,"Title":"Rowley Road/Kargotich Rd intersection upgrade","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=5263e64a-93e0-4490-a5fd-66894f1364a6","MapType":"Marker","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Intersection upgrades at Rowley Road and Kargotich Rd, Oakford will be occurring from Monday 14th April, 2025.\r\nWorks will be taking place within the new Cataspa Business Park in South Forrestdale, requiring a temporary road closure of Kargotich Road to complete the intersection upgrades.\r\nThe Shire advises that Kargotich Road, at the intersection of Rowley Road, will be temporarily closed from 14/4/2025 until 12/5/2025, with detours in place via Thomas Road during this time.\r\nFor more information, visit the City of Armadale’s website or contact them on 9394 5000.","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"11/04/2025","PublishTo":"15/05/2025","LastUpdated":"Friday, 11 April 2025 2:04 PM","SubTitle":""},{"EntityId":159,"Guid":"37fe20ba-5448-4202-acbf-d9ae0af6ff24","ShowOnMap":true,"DisplayInTable":true,"Title":"Temporary Closure Kargotich and Orton Roads","Category":"Road Works","ShareUrl":"https://www.sjshire.wa.gov.au/roadreport/?shareUrl=37fe20ba-5448-4202-acbf-d9ae0af6ff24","MapType":"Drawing","SparkModule":64,"MarkerTitle":null,"MarkerDescription":null,"VehicleReportData":"","Comments":"Temporary closure of Kargotich Road between Thomas Road and Orton Road, and Orton Road between Hopkinson Road and Kargotich Road.\r\n\r\nClosures and detours will be required, including:\r\n\r\nKargotich Road: closed between Thomas Road and Orton Road.\r\nOrton Road: closed between Hopkinson Road and Kargotich Road.\r\n\r\nPlanned timeframe: 10 February 2025 to 15 May 2025 on Kargotich Road and 10 March 2025 to 30 April 2025 on Orton Road, (subject to change due to factors like weather).","Type":{"EntityId":2,"Name":"Closed","MarkerIcon":"/roadreport/controls/images/closed-marker.png","WebIcon":"/roadreport/controls/images/closed-icon.png","PrimaryColour":"#c72e4b","BackgroundColour":"#000000"},"MappingData":null,"PublishFrom":"9/02/2025","PublishTo":"","LastUpdated":"Wednesday, 26 February 2025 3:14 PM","SubTitle":""}],"mapDataCount":11}